Archived Pipeline Rulemakings

You are here

Archived Pipeline Rulemakings: 1986-1988

Pipeline Rulemakings from 1986-1988
FR DateRule NameDocket NumberRulemaking ActionRulemaking PhaseCitation Link
11/21/1988Control of drug use in natural gas, liquified natural gas and hazardous liquid pipeline operations.PS-102final ruleFR53 FR 47084
11/2/1988Procedures for Transporation Workplace Druga and Alcohol Testing ProgramsOST-45928final ruleFR53 FR 47002
9/22/1988Transporting of natural and other gas by pipeline; Incorporation by Reference of ASTM D2513PS-103final ruleFR53 FR 36793
9/16/1988Exemption from pressure testing non-welded tie joints.PS-98direct final ruleDFR53 FR 36028
9/8/1988Reporting unsafe conditions on gas and hazardous liquid pipelines and liquified natural gas facilities.PS-96final rule correctionFR53 FR 29800
7/13/1988Reporting unsafe conditions on gas and hazardous liquid pipelines and liquified natural gas facilities.PS-96final rule correctionFR53 FR 26560
7/1/1988Reporting unsafe conditions on gas and hazardous liquid pipelines and liquified natural gas facilities.PS-96final ruleFR53 FR 24942
7/1/1988Gas and hazardous liquid pipelines; referenced standards deletion afftecting iron, steel, and copper pipe and other materialsPS-95notice of proposed rulemakingNPRM53 FR 24968
6/30/1988Excavation damage prevention programs for gas and hazardous liquid and carbon dioxide pipelinesPS-101notice of proposed rulemakingNPRM53 FR 24747
4/4/1988Gas detection and monitoring in compressor station buildingsPS-100advance notice of proposed rulemakingANPRM53 FR 10906
1/21/1988Pipeline safety standards and procedures; Miscellaneous amendments.PS-99direct final ruleDFR53 FR 1633
1/15/1988Confirmation or revision of maximum allowable operating pressure, alternative methodPS-97notice of proposed rulemakingNPRM53 FR 1043
1/15/1988Exception from pressure testing non-welded tie-in jointsPS-98notice of proposed rulemakingNPRM53 FR 1045
9/25/1987Reporting unsafe conditions on gas and hazardous liquid pipelines and liquified natural gas facilitiesPS-96notice of proposed rulemakingNPRM52 FR 36068
9/1/1987Transportation of natural and other gas by pipeline; confirmation or revision of maximum allowable operating pressure near certain occupied buildings and outside areas.PS-84final ruleFR52 FR 32924
8/31/1987Gas pipeline damage prevention programs.PS-88final ruleFR52 FR 32798
6/4/1987Gas and hazardous liquid pipelines; referenced standards deletion afftecting iron, steel, and copper pipe and other materialsPS-95advance notice of proposed rulemakingANPRM52 FR 21087
3/23/1987Pipeline Operator QualificationPS-94advance notice of proposed rulemaking-withdrawalANPRM52 FR 9189
2/11/1987Proposals for Pipeline Safety; Request for commentPS-93advance notice of proposed rulemakingANPRM52 FR 4361
1/8/1987Fire protection and security of waterfront liquefied natural gas facilities.PS-89final ruleFR52 FR 674
11/18/1986Transporation of natural and other gas by pipeline; Exceptions from nondestructive testing of welds in transmission line repairPS-92final ruleFR51 FR 41634
10/31/1986Transportation of natural and other gas by Pipeline:  Period for Confirmation or Revision of MAOPPS-90final ruleFR51 FR 34987
8/18/1986Transportation of natural gas and other gas by pipelines; confirmation or revision of maximum allowable operating pressure near certain occupied buildings and outside areasPS-84notice of proposed rulemakingNPRM51 FR 29504
7/8/1986Interval for Review and Calculation of Relief Device CapacityPS-91final rule correctionFR49 FR 24722
7/2/1986Transportation of natural and other gas by pipeline; Exceptions from nondestructive testing of welds in transmission line repairPS-92notice of proposed rulemakingNPRM51 FR 24174
6/17/1986 Interval for Review and Calculation of Relief Device CapacityPS-91notice of proposed rulemakingNPRM51 FR 21939
6/10/1986Transportation of hazardous liquids, gathering lines in rural areasPS-85final ruleFR51 CFR 20976
6/4/1986Transportation of gas or hazardous liquids by pipeline, welding requirementsPS-87final ruleFR51 FR 20294
6/3/1986Transportation of natural and other gas by Pipeline:  Period for Confirmation or Revision of MAOPPS-90notice of proposed rulemakingNPRM51 FR 19878
5/20/1986Transportation of natural and other gas by pipeline: Interior PipingPS-67advance notice of proposed rulemaking-correctionANPRM51 FR 18465
5/16/1986Fire protection and security of waterfront liquified natural gas facilitiesPS-89notice of proposed rulemakingNPRM51 FR 18276
5/2/1986Transportation of natural and other gas by pipeline: Interior PipingPS-67advance notice of proposed rulemakingANPRM51 FR 16362
4/23/1986Transporting of gas or hazardous liquid by pipeline; updating steel line pipe specificationsPS-86final ruleFR51 FR 15333
4/22/1986Transportation of hazardous liquids, gathering lines in rural areasPS-85final ruleFR51 CFR 15005
3/4/1986Periodic updates to the pipeline safety regulationsPS-143notice of proposed rulemakingNPRM61 FR 8213
1/23/1986Transportation of natural and other gas by pipeline; Monitoring of External Corrosion ControlPS-76advance notice of proposed rulemaking and withdrawalANPRM51 FR 3085
Updated: Wednesday, August 29, 2018

Contact Us

Pipeline Standards and Rulemaking
U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
United States
Phone: 202-366-4595
Fax: 202-366-4566
Business Hours:
9:00am-5:00pm ET, M-F

Share