Action
Final rule; correction.
Summary
This document corrects a final rule published November 4, 1998 (63 FR 59475). This final rule allows operators of older hazardous liquid and carbon dioxide pipelines to elect a risk-based alternative in lieu of the existing hydrostatic pressure test rule. This document makes a minor correction by removing an unrelated sentence that inadvertently appeared in Table 4 of the Appendix B.