Action
Notice.
Summary
Chevron Pipe Line Company (CPL) has petitioned the Research and Special Programs Administration for a waiver from compliance with 49 CFR 19.612(b)(3), which requires that gas pipeline facilities in the Gulf of Mexico found to be exposed on the seabed or constituting a hazard to navigation be reburied so that the top of the pipe is 36 inches below the seabed for normal excavation or 18 inches for rock excavation.