Action
Grant of waiver; Sabine Pass LNG, L.P.
Summary
Sabine Pass LNG, L.P. (SPLNG) requested a waiver of compliance from the Federal pipeline safety regulation that requires liquefied natural gas (LNG) facilities constructed after March 31, 2000 to comply with the National Fire Protection Association's Standard 59A (NFPA 59A), 2001 Edition. The waiver specifically requested permission to use ultrasonic examination as an acceptable alternative non-destructive testing method for welds on LNG tanks.