Action
Notice of intent to consider waiver request.
Summary
Alliance Pipeline L.P. (APL) requested a waiver of compliance for the U.S. portion of its pipeline system in Class 1 and Class 2 locations to operate its pipeline at stress levels up to 80 percent of the pipeline's specified minimum yield strength (SMYS), and increase the design factor for its compressor station piping. APL also requested relief from the hydrostatic testing requirements for its compressor station piping and pressure relieving and limiting station equipment requirements.