Action
Final rule; correction.
Summary
On February 23, 2005, the U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS) issued a final rule adopting as a final rule, the interim final rule which was issued on January 5, 1993. This final rule also made minor amendments to some of the regulations in Part 194 in response to public comments and the experience that OPS gained in implementing the interim final rule, leading spill response exercises, and responding to actual spills. The amendments were generally technical in nature and did not involve additional costs to pipeline operators or the public. In issuing the final rule, a table was inadvertently misprinted. This table in Sec. 194.105(b)(3) specifies the potential spill volume reduction credits operators may use when they have secondary containment and other spill prevention measures on breakout tanks. These spill reduction credits are used when calculating the worst case discharge volume. This correction replaces the incorrect table with the correct table.