Archived Rulemaking: Pipeline LPG Tanks; Testing of relief valves on storage tanks
The Hazardous Materials Regulations Board is considering an amendment to 1195.428 that would extend from 6 months to 5 years the Interval required of pipeline carriers for testing relief valves on horizontal pressure storage vessels containing liquefied petroleum gas (LPG). The requirement for Inspection of these valves at 6-month intervals would not be changed.