USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

Interpretation Response #PI-87-001 ([Westar Transmission Company] [Nabil S. Dia, P.E.])

Below is the interpretation response detail and a list of regulations sections applicable to this response.

Interpretation Response Details

Response Publish Date:

Company Name: Westar Transmission Company

Individual Name: Nabil S. Dia, P.E.

Location State: TX Country: US

View the Interpretation Document

Response text:

Mr. Nabil S. Dia, P.E.

Westar Transmission Company

P.O. Box 0-

Amarillo, Texas 79189

Dear Mr. Dia:

Your December 22, 1986, letter to this Office asks, if a welder qualified under the requirements of §192.227(a), in accordance with Section IX of the ASME Boiler & Pressure Vessel Code (destructive testing), has a production weld tested and accepted under section 6 of API Standard 1104 (nondestructive testing) every 6 months as required by §192.229(c), is that welder subject to further follow-up destructive testing.

The requirements of §192.229(a) do not apply because the original welder qualification under §192.227(a) was based on destructive testing. The periodic testing required by §192.229(c) as a verification of the original qualification under Section IX of ASME is net by the 6-month x-rays. Therefore, further destructive testing is not required to maintain the original qualification under §192.227(a).

Sincerely,

/signed/

Richard L. Beam

Acting Director

Office of Pipeline Safety