USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

192.105

Section §192.105: Design formula for steel pipe

Below are the available interpretations and guidance for the given section. To return to the list of parts, use the Parts link above. If you do not see any guidance or interpretation information below, that means there is none available for the given part/section. Return to the search page to browse additional regulations sections.

PHMSA has published several Frequently Asked Questions (FAQ) documents on regulatory topics. Please review our FAQ documents below:

https://www.phmsa.dot.gov/about-phmsa/phmsa-faqs.

Additionally PHMSA has Hazardous Materials FAQs based on letters of interpretation on the following topics:

This section of the website provides the ability to find regulations information including regulations parts, content of sections, and interpretations for regulations sections. Below is a list of parts, identified by the part number and subject. To browse sections by part, click on the subject link below. You will be taken to the eCFR website to view sections for a part.

A written regulatory interpretation, response to a question, or an opinion concerning a pipeline safety issue may be obtained by submitting a written request to the Office of Pipeline Safety (PHP–30), PHMSA, U.S. Department of Transportation, 1200 New Jersey Avenue SE., Washington, DC 20590–0001 or at the email address: pipeline_interp_submittal@dot.gov. In addition to email address, the requestor must include his or her return address and should also include a daytime telephone number. Requests should be submitted at least 120 days before the time the requestor needs a response.

Note: electronic submission is provided as alternative to the 49 CFR Part 190.11(b) mail-in requirement.

The regulations text of the section can be found on the eCFR website. To view the regulations text, use the link below. For assistance, please send an email to PHMSA.Webmaster@dot.gov.

View section 192.105 on the ECFR website

Interpretation Responses

Ref ID Date Company Name Individual Name Response Document
PI-76-082 OPSO Advisory Bulletin View
PI-73-020 Alemda Welding & Inspection Company B. H. Clements View
PI-72-016 CONAM Inspection, Inc. David A. Warren View
PI-76-076 ASME Gas Piping Standards Committee R. L. Dean View
PI-72-051 Columbia Gas Service Company Don T. Caffery View
PI-74-0132 Williams Brothers Engineering Company Mr. Clint McClure View
PI-75-059 Williams Brothers Engineering Company J. L. Williams View
PI-82-0112 View
PI-78-015 The Australian Gas Light Company Mr. C. B. Rumble View
PI-70-0113 Superintendent of Gas and Water Construction Cedar Falls Utilities Mr. Don Corwin View
PI-71-068 ACF Industries, Inc. R. M. Estes View
PI-78-019 LAVALCO Pipeline Products Division Mr. James H. Thompson, View
PI-70-024 Missouri Power and Light Company J. F. Nienhueser View
PI-74-0113 Minnesota Highway Department Mr. J. G. Osendorf View