USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

173.410

Section §173.410: General design requirements

Below are the available interpretations and guidance for the given section. To return to the list of parts, use the Parts link above. If you do not see any guidance or interpretation information below, that means there is none available for the given part/section. Return to the search page to browse additional regulations sections.

PHMSA has published several Frequently Asked Questions (FAQ) documents on regulatory topics. Please review our FAQ documents below:

https://www.phmsa.dot.gov/about-phmsa/phmsa-faqs.

Additionally PHMSA has Hazardous Materials FAQs based on letters of interpretation on the following topics:

This section of the website provides the ability to find regulations information including regulations parts, content of sections, and interpretations for regulations sections. Below is a list of parts, identified by the part number and subject. To browse sections by part, click on the subject link below. You will be taken to the eCFR website to view sections for a part.

A written regulatory interpretation, response to a question, or an opinion concerning a pipeline safety issue may be obtained by submitting a written request to the Office of Pipeline Safety (PHP–30), PHMSA, U.S. Department of Transportation, 1200 New Jersey Avenue SE., Washington, DC 20590–0001 or at the email address: pipeline_interp_submittal@dot.gov. In addition to email address, the requestor must include his or her return address and should also include a daytime telephone number. Requests should be submitted at least 120 days before the time the requestor needs a response.

Note: electronic submission is provided as alternative to the 49 CFR Part 190.11(b) mail-in requirement.

The regulations text of the section can be found on the eCFR website. To view the regulations text, use the link below. For assistance, please send an email to PHMSA.Webmaster@dot.gov.

View section 173.410 on the ECFR website

Interpretation Responses

Ref ID Date Company Name Individual Name Response Document
20-0046 R.B. Natali Consulting, Inc. Ronald B. Natali View
20-0025 Entergy Donnie James View
18-0027 Veolia North America Ms. Jennifer Eberle View
11-0289 CH2MHILL Plateau Remediation Mr. Chris Backus View
05-0138 MHF Logistical Solutions Mr. Kurt Colborn View
05-0227 Regulatory Resources, Inc. Mr. Wade A. Winters View
06-0201 Oak Ridge National Laboratory Mr. Mark B. Hawk View
11-0302 Navarro Research and Engineering, Inc. Mr. David Wilson View
11-0296 Washington Closure Hanford, LLC Mr. Robinson E. Fillmore View
15-0195 Prairie Island Nuclear Generating Plant Mr. Clay Sweet View
13-0060 International Radiation Safety Consulting, Inc. Mr. Timothy Brandon View