General
Root Cause Analysis of the MP-171 Fort Ransom [REDACTED] (Part 2) – September 15, 2025
Root Cause Analysis of the MP-171 Fort Ransom [REDACTED] (Part 2) – September 15, 2025
Root Cause Analysis of the MP-171 Fort Ransom [REDACTED] (Part 1) – September 15, 2025
Root Cause Analysis of the MP-171 Fort Ransom [REDACTED] (Part 1) – September 15, 2025
PHMSA Corrective Action Order to Delfin Offshore Pipeline, LLC
PHMSA issued this Corrective Action Order to Delfin Offshore Pipeline, LLC directing the operator to take certain corrective actions following a February 3, 2026, pipeline failure in Cameron Parish, Louisiana. See CAO for more details.
Metallurgical Analysis REDACTED - June 13, 2025
Metallurgical Analysis REDACTED - June 13, 2025
PHMSA Safety Advisory Highlights Risks Associated with Extreme Winter Weather
Contact: PHMSAPublicAffairs@dot.gov
The U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) today announced a safety advisory to operators of gas and hazardous liquid pipeline facilities highlighting the safety risks associated with...