General
Electro Magnetic Acoustic Transducer Sensor for Small Diameter and Unpiggable Pipes; Prototype and Testing DTPH5615T00018L
The project developed and then demonstrated the ability of the Electro Magnetic Acoustic Transducer (EMAT) crack tool to detect tight/closed cracks down to 2MM deep for 8” diameter pipes in traditionally difficult to inspect pipelines. The Intellectual Property from this research and from the...
Improved Tools to Locate Buried Pipelines in a Congested Underground 693JK31810009
The project developed and validated a geospatial probe to map existing buried utilities through insertion into live gas pipelines. The resulting technology transfer led to the Live Gas Mapper (LGM-2) tool by REDUCT. The LGM-2 can map buried live gas pipes with an ID range of 50mm up to 100mm (2...
Safety Advisory Notice: Classification of MPXV Diagnostic Samples and Waste
The Safety Advisory Notice shares new advice from the Centers for Disease Control and Prevention (CDC) regarding diagnostic samples and clinical waste containing Monkeypox virus (MPXV) in Clade I or II. The advice clarifies that samples and clinical waste should be designated as Category B...
FY 2022 Q3 FOIA Log
FY 2022 Q3 FOIA Log
ICAO Energy Storage Devices Working Group
The International Civil Aviation Organization (ICAO) Dangerous Goods Panel created the Energy Storage Devices Working Group to ensure provisions related to the transport of lithium batteries or other energy storage devices...
HL Integrity Assurance Notifications
PHMSA hazardous liquid regulations require operators to submit various notifications. These regulations include Integrity Management and Remote Controlled Valves. A complete list of notifications is:
Non-Steel Liquid Pipe §195.8 ...intent to install non-steel pipe for hazardous liquid...GT Integrity Assurance Notifications
PHMSA gas transmission regulations require operators to submit various notifications. These regulations include Integrity Management, MAOP Reconfirmation and Material Verification, and Remote Controlled Valves. A complete list of notifications is:
Management of Change Extension §192.13...GG Integrity Assurance Notifications
PHMSA gas gathering regulations require operators to submit these notifications:
Start/End Point Delay Onshore §192.8(b)(2) ...operators unable to complete a determination of gathering start and end points by November 16, 2022 must submit the notification no later than 90 days before...
Publicaciones (en español)
For English
La División de alcance, capacitación y subsidios desarrolla materiales que facilitan la comprensión y el cumplimiento de los reglamentos de materiales peligrosos (HMR). Algunas publicaciones...