You are here

  • § 180.1
    Purpose and scope
  • § 180.3
    General requirements
  • § 180.203
    Definitions
  • § 180.205
    General requirements for requalification of specification cylinders
  • § 180.207
    Requirements for requalification of UN pressure receptacles
  • § 180.209
    Requirements for requalification of specification cylinders
  • § 180.211
    Repair, rebuilding and reheat treatment of DOT-4 series specification cylinders
  • § 180.212
    Repair of seamless DOT 3-series specification cylinders and seamless UN pressure receptacles
  • § 180.213
    Requalification markings
  • § 180.215
    Reporting and record retention requirements
  • § 180.350
    Applicability and definitions
  • § 180.352
    Requirements for retest and inspection of IBCs
  • § 180.401
    Applicability
  • § 180.403
    Definitions
  • § 180.405
    Qualification of cargo tanks
  • § 180.407
    Requirements for test and inspection of specification cargo tanks
  • § 180.409
    Minimum qualifications for inspectors and testers
  • § 180.411
    Acceptable results of tests and inspections
  • § 180.413
    Repair, modification, stretching, rebarrelling, or mounting of specification cargo tanks
  • § 180.415
    Test and inspection markings
  • § 180.416
    Discharge system inspection and maintenance program for cargo tanks transporting liquefied compressed gases
  • § 180.417
    Reporting and record retention requirements
  • § 180.503
    Definitions
  • § 180.509
    Requirements for inspection and test of specification tank cars
  • § 180.511
    Acceptable results of inspections and tests
  • § 180.513
    Repairs, alterations, conversions, and modifications
  • § 180.519
    Periodic retest and inspection of tank cars other than single-unit tank car tanks
  • § 180.605
    Requirements for periodic testing, inspection and repair of portable tanks

Part 180 CONTINUING QUALIFICATION AND MAINTENANCE OF PACKAGINGS

Section § 180.511: Acceptable results of inspections and tests

Below are the available interpretations for the given section. To return to the list of parts, use the Parts link above. The menu to the left provides a full list of sections that have interpretations. To view interpretations for a different section, click on the menu item.

The regulations text of the section can be found on the eCFR website. To view the regulations text, use the link below. For assistance, please send an email to PHMSA.Webmaster@dot.gov.
View regulations for Part 180

Ref ID Date Company Name Individual Name Response Document
19-0094 12-06-2019 Wells Fargo Rail Robert Sech View