Interpretation Response #PI-73-033 ([Buckeye Pipe Line Company] [G. A. Chilcote])
Below is the interpretation response detail and a list of regulations sections applicable to this response.
Interpretation Response Details
Response Publish Date:
Company Name: Buckeye Pipe Line Company
Individual Name: G. A. Chilcote
Location State: PA Country: US
View the Interpretation Document
Response text:
Nov 5 1973
Mr. G. A. Chilcote
  Manager, Engineering & Construction
  Buckeye Pipe Line Company
  P.O. Box 368
Emmaus, PA 18049
Dear Mr. Chilcote:
This refers to your letter of September 18, 1973, requesting an interpretation of Section 195.248. Specifically, Buckeye is requesting an interpretation of "impracticable" as used in Section 195.248(b)(1) and an interpretation of "equivalent" as used in Section 195.248(b)(2). The interpretation in these two sections are requested to determine whether 48 inches of cover is required pursuant to Sections 195.210(b) and 195.248(a) for approximately half of the 17 miles of a 20-inch products pipeline that Buckeye is preparing to lay across Middlesex County, New Jersey.
The Office of Pipeline Safety considers that the term "impracticable" means the carrier is incapable of complying with   the required pipeline cover. You itemized four factors which in   your opinion tend to make a
48-inch cover impracticable. The   first two items appear to be based on the high cost of   constructing this proposed pipeline, without any supporting   information on this cost. These two factors are not sufficient   reason to support your contention that the 48-inch cover is   impracticable. The last two items are based on possible future   occurrences and similarly cannot be used to substantiate that the construction of this proposed pipeline is impracticable.
Since the regulations provided for additional protection equivalent to the minimum cover required only when it is impracticable to comply with the minimum cover requirements, the additional protection Buckeye proposes is not applicable in this case.
We trust that this has answered your particular inquiry. If we can be of further assistance, please let us know.
Sincerely,
'signed'
Joseph C. Caldwell
  Director
  Office of Pipeline Safety 