Below is a list of the sections that have interpretations available for the selected category. To view the interpretations for a given section, click on the subject link below. To return to the list of Parts, use the Parts link above. Finally, these interpretations are specific to the scenarios in which they are responding to and may not be applicable to different fact scenarios.

The eCFR is also searchable by keyword and other available options on the eCFR website. To search and browse regulations using the eCFR website, use the link below. For assistance, please send an email to PHMSA.Webmaster@dot.gov.
Search the eCFR

Section Subject
192.513 Test requirements for plastic pipelines
192.515 Environmental protection and safety requirements
192.517 Records
192.551 Scope
192.553 General requirements
192.555 Uprating to a pressure that will produce a hoop stress of 30 percent or more of SMYS in steel pipelines
192.557 Uprating: Steel pipelines to a pressure that will produce a hoop stress less than 30 percent of SMYS: plastic, cast iron, and ductile iron pipelines
192.603 General provisions
192.605 Procedural manual for operations, maintenance, and emergencies
192.609 Change in class location: Required study
192.611 Change in class location: Confirmation or revision of maximum allowable operating pressure
192.612 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets
192.613 Continuing surveillance
192.614 Damage prevention program
192.615 Emergency plans
192.616 Public awareness
192.617 Investigation of failures
192.619 Maximum allowable operating pressure: Steel or plastic pipelines
192.620 Alternative maximum allowable operating pressure for certain steel pipelines
192.621 Maximum allowable operating pressure: High-pressure distribution systems
192.623 Maximum and minimum allowable operating pressure; Low-pressure distribution systems
192.625 Odorization of gas
192.631 Control room management
192.701 Scope
192.703 General
192.705 Transmission lines: Patrolling
192.706 Transmission lines: Leakage surveys
192.707 Line markers for mains and transmission lines
192.709 Transmission lines: Record keeping
192.713 Transmission lines: Permanent field repair of imperfections and damages
192.715 Transmission lines: Permanent field repair of welds
192.717 Transmission lines: Permanent field repair of leaks
192.719 Transmission lines: Testing of repairs
192.721 Distribution systems: Patrolling
192.723 Distribution systems: Leakage surveys
192.725 Test requirements for reinstating service lines
192.727 Abandonment or deactivation of facilities
192.731 Compressor stations: Inspection and testing of relief devices
192.735 Compressor stations: Storage of combustible materials
192.739 Pressure limiting and regulating stations: Inspection and testing
192.740 Pressure regulating, limiting, and overpressure protection-Individual service lines directly connected to production, gathering, or transmission pipelines
192.741 Pressure limiting and regulating stations: Telemetering or recording gauges
192.743 Pressure limiting and regulating stations: Capacity of relief devices
192.747 Valve maintenance: Distribution systems
192.753 Caulked bell and spigot joints
192.755 Protecting cast-iron pipelines
192.801 Scope
192.807 Recordkeeping
192.903 What definitions apply to this subpart?
192.917 How does an operator identify potential threats to pipeline integrity and use the threat identification in its integrity program?